Skip to content

Maxcroft

Status

  • Granted outline permission September 2025. (PL/2023/10559)
  • Decision yet to be formalised
  • See the application here

The Proposal

  • Demolition of existing farm buildings and the erection of up to 180 residential dwellings

The Problem

  • Fails to abide by Bat Mitigation strategy
  • Serious flooding concerns and highway issues on an already busy road